Eaglewood Loop 2021 Secondary Water Line & Street Reconstruction

Slide2

The City is installing a new secondary water line and reconstructing Eaglewood Loop, Rockwood Drive and Tanglewood Loop (the south section of Tanglewood Loop only). 

  • All residents whose water meters abut these streets will have their outdoor water converted to the new secondary water system.
  • Residents along Woodbriar Way, Woodbriar Circle and Mariwood Circle will have their outdoor water converted to the secondary water system where new laterals were previously installed, but there will not be street reconstruction in this area. 

A 3-PHASE PROJECT

Phases 1 and 2: 

  • Installation of secondary water lines and road reconstruction on the north 2/3 of Eaglewood Loop (from Woodbriar Way to the 4-way stop at Eagleridge Drive), all of Rockwood Drive and the south section of Tanglewood Loop. 

Phase 3:

  • We have determined that Phase 3 of this project cannot be done this year. Phase 3 will be done as quickly as possible in the Spring of 2022. (Phase 3 includes the section of Eaglewood Loop between from Woodbriar Way south to Eagleridge Drive.) 
contact us button
secondary water construction pic

HOW WILL THIS AFFECT YOU? 

Untitled design (4)

An Information Meeting was held for residents in June, 2021.

View PRESENTATION SLIDES

Slide1





VIEW RECORDED ZOOM MEETING

PROJECT CONTACTS:

Staker Parson (General Contractor)

City of North Salt Lake

  • Karyn Baxter, P.E. (Project Engineer)
  • 801-335-8722 (office)
  • 801-301-6019 (mobile)
  • karynb@nslcity.org