The City is beginning construction on a new secondary water line and street reconstruction project on Eaglewood Loop, Rockwood Drive and Tanglewood Loop (the south section of Tanglewood Loop only). All residents whose water meters abut these streets will have their outdoor water converted to the new secondary water system. In addition, residents along Woodbriar Way, Woodbriar Circle and Mariwood Circle will have their outdoor water converted to the secondary water system where new laterals were previously installed, but there will not be street reconstruction in this area. 

Construction should begin between late April and early May, depending on availability of piping materials. Our expected completion is September/October of this year. This project construction will be done in phases.

Two information meetings for residents will be held April d15th and April 17th, 2021.