Week of August 2

Week of August 2

The secondary water main has been installed along Eaglewood Loop from Elk Hollow Drive to Rockwood Drive. Service laterals to the homes are currently being installed in this same area. Due to the recent rain event, much of the trenchwork along Eaglewood Loop will be re-excavated, and new material will be backfilled and compacted in the trenches. This will be done next week. In addition, a new pressure reducing valve and vault will be installed next week at 1162 East Eaglewood Loop.