Please note: water line work will begin Monday, March 14th on Eaglewood Loop between Sego Lily Circle and Skyview Circle. This area will be CLOSED to thru traffic (as the water line is in the middle of the road). All traffic must use the north entrance of Eaglewood Loop (at the 4-way stop by Eaglewood club house).
Residents living within the work zone -- or the very western part of south Eaglewood Loop-- may enter and exit through the "road closed" sign at Eagleridge Drive. As the work moves along the road, please enter and exit away from the construction to avoid having to turn around. One lane will be maintained whenever possible, although it may not always be available.
See graphic below.